top of page
Pipe laying

YOUR PERMIT BATTLE ENDS HERE

Petroleum Contractors

Petroleum infrastructure projects don't wait for bureaucracy. When you're building fuel stations, tank farms, pipelines, or petroleum distribution facilities, every day of permit delay costs you money and momentum. Permit Ninjas stands in the gap between your project and the red tape that threatens to stall it.

AdobeStock_904418633.jpeg

Our Approach 

We Meet You Where You Are

Every contractor operates differently. Your permitting needs depend on your size, your projects, and your team.
We don't force you into a one-size-fits-all solution—we adapt to how you work.

The Petroleum Permitting Battlefield​

The Common Thread:

Every petroleum contractor faces the same core frustrations:

  • Multiple agencies, zero coordination between them

  • One permit delay cascades into schedule chaos and cost overruns

  • Regulations that vary wildly from one jurisdiction to the next

  • Crews and equipment sitting idle, burning money while waiting for paper

  • Clients breathing down their necks about opening dates and revenue loss

  • The sinking feeling that they're one missed requirement away from starting over

Permitting Battlefield.png

Underground Storage Tank (UST) Installation Permits

You're juggling fire marshal approvals, EPA compliance, soil assessments, and leak detection certifications across agencies that don't coordinate—while your crew sits idle and costs pile up. One missed environmental form triggers fines, stop-work orders, and months of delays.

 

You know how to install tanks safely, but you shouldn't have to become an expert in environmental law just to get permission to do your work.

 

You need an ally who speaks every agency's language, knows which forms are required before rejection, and keeps your project moving—because we know what's on the line when it doesn't.

generated-image-2025-11-06 (3).png

Fuel Dispenser & Pump Island Permits

You're juggling electrical, mechanical, and fire safety permits simultaneously while your dispensers sit in warehouses costing money daily. Fire marshals interpret explosion-proof equipment requirements differently in every jurisdiction, setback rules nobody explained trigger rejections, and inspection timelines never align—so your crew waits while your margin evaporates. You know how to install fuel systems safely, but coordinating three permit types across agencies that don't communicate shouldn't fall on you.

 

You need someone who knows the fire code interpretations before you submit and keeps all three tracks moving in sync—because dispensers in storage aren't making anyone money.

EV Charging Station Permits

You're navigating brand-new EV regulations that evolve rapidly, managing electrical load calculations and utility coordination that require specialized expertise, while ADA compliance and parking requirements add layers of complexity to your scope. Electrical service upgrades often trigger additional permits, and jurisdictions are still developing their processes for these installations—which means longer timelines and more unknowns.

 

You need someone who's already worked through these emerging requirements across multiple jurisdictions, knows which utility coordination steps prevent delays, and can navigate the evolving landscape so your project keeps moving—because being on the leading edge of this technology shouldn't mean being stuck in permitting limbo.

generated-image-2025-11-06 (4).png
cstore

Ground-Up Convenience Store Building Permits

You're coordinating site, building, plumbing, electrical, mechanical, fire, and health department permits—each on its own timeline, each capable of stopping your entire construction sequence. One delayed permit holds up five others, plan review comments trigger architect revisions and resubmittals, and your client's opening date slips further away with every round of corrections. The domino effect is real: you can't frame until site work is approved, can't rough-in until building permits clear, and can't open without a Certificate of Occupancy that depends on every other approval falling into place.

 

You need someone who can coordinate all six permit tracks simultaneously, anticipate plan review issues before submission, and keep the sequence moving—because one bottleneck shouldn't derail your entire project timeline.

Canopy Structure Permits

You're managing structural engineering requirements that vary by wind zone, foundation permits requiring soil reports and engineering stamps, lighting permits triggering photometric studies, and electrical permits for canopy equipment—all before installation even begins.

 

Hurricane and wind load requirements in coastal areas demand expensive engineering, height restrictions and setback violations get discovered mid-project, and lighting ordinances can force complete redesigns after your canopy is already fabricated. One missed requirement means rework, re-engineering, and watching your fabricated structure sit unusable while you chase approvals.

 

You need someone who knows the wind load and setback requirements before you fabricate, can coordinate structural and electrical permits simultaneously, and catches lighting ordinance issues upfront—because discovering problems after fabrication is too late and too costly.

canopy

WHAT WE DO

We fight through the permitting process so you don't have to. From code research to final approval, we handle the battle while you focus on building.

NATIONWIDE SERVICE!

  • Instagram
  • Facebook
  • LinkedIn
  • YouTube

CONTACT US

Hours:
Mon to Fri: 9:00 am to 4:00 pm 
Sat and Sun: Closed

Email:
info@mypermitninja.com

Phone:
(727) 408-6991

Address:
303 Main Street, Suite M
Dunedin, FL 34698

IMG_2362 (1)_edited.png
bottom of page